Non-Compliance detail


  
Summary
 
Licence number: 828
Annual Return Start: 01 Apr 2008
Annual Return End: 31 Mar 2009
Date Received: 25 May 2009
 
Licence Condition numberType of non-complianceEPA actionsNo. of times occurred
P1 Discharge of Ammonia vapour from Ammonia Plant Vent Stack. Appropriate Action taken by licensee 2
L2 Monitoring Point 20 - Nitrogen oxide mass discharge of 701,713 kg exceeded the Load Limit of 644,950kg. Appropriate Action taken by licensee 1
L3.1 Monitoring Point 20 - Reformer Stack concentration of 0.48mg/Nm3 (NOx as NO2) which is above the licence limit of 0.35mg/Nm3. Appropriate Action taken by licensee 1
L3.1 Monitoring Point 23 - Exceedence of effluent temperature limit during licence year. Appropriate Action taken by licensee 8
M2.1 Monitoring Points 10,11,12,13 - Failure to collect stormwater samples during rain events. Appropriate Action taken by licensee 2
M2.1 Monitoring Point 14 - Failure to collect stormwater samples during rain events. Appropriate Action taken by licensee 2